CPG Operator Guide

Co-Manufacturing Direct Cost Scope Guide

Use this guide to define one SKU, production-run, currency, and salable-unit scope and identify the current records behind the seven inputs owned by the Co-Packer Direct Cost Planner.

Define the SKU, run, and unit basis

State one SKU or pack configuration, one production run or scenario, one currency, and one salable-unit basis. Mixed packs, periods, or currencies require explicit reconciliation outside this guide.

What to include

Identify the tolling source

Name the current quote, invoice, contract schedule, or operating record supporting the proposed tolling amount and state whether its basis is per unit, case, batch, hour, or another stated basis.

What to include

Separate material and packaging records

Identify current raw-material and packaging records separately, including brand-supplied versus co-packer-supplied responsibility and any missing, bundled, or unresolved items.

What to include

State freight ownership and basis

Identify inbound and outbound freight records, delivery terms, locations, dates, and exclusions without converting, allocating, or inferring freight.

What to include

Prepare salable units and loss assumptions

Identify the planned salable-unit record and the source and scope of any expected material-loss assumption. Do not infer a rate or present a benchmark.

What to include

Preserve inclusions, exclusions, and dates

List setup, testing, storage, handling, changeover, disposal, tax, overhead, financing, channel, and other items as included, excluded, bundled, unknown, or handled by a separate method.

What to include

Hand the prepared inputs to the owner

Enter only reviewed assumptions in the Co-Packer Direct Cost Planner and retain the source packet, unit basis, dates, inclusions, exclusions, and unresolved questions beside its result.

What to include

How this page fits the Tools system

The Co-Packer Direct Cost Planner owns all direct-cost arithmetic; this page owns source-scope preparation only.

The guide ends with a reviewed seven-category source packet, not direct cost, run cost, complete COGS, margin, savings, price, accounting treatment, or a supplier decision.

What this page does—and does not—show

This guide prepares source scope for the Co-Packer Direct Cost Planner. It does not estimate or calculate cost, validate a quote, determine accounting treatment, complete COGS, recommend a price, or select a co-packer.

The Co-Packer Direct Cost Planner exclusively executes COPACKER-DIRECT-COST-V1; this guide prepares source scope and contains no controls, formula, conversion, or numeric output.

Evidence and review boundary

Tier C. This guide prepares source scope for the Co-Packer Direct Cost Planner. It does not estimate or calculate cost, validate a quote, determine accounting treatment, complete COGS, recommend a price, or select a co-packer.

Operations and finance owners using current quotes, invoices, contracts, production plans, material, packaging, freight, and run records.

No external rate or rule is embedded; values and assumptions come from the user.

Related tools and next steps

Help shape the operations platform for food brands.

Guidance is being rebuilt with CPG design partners to connect these planning steps to a shared operating model. That connected product workflow is not available for live product demonstrations today. This standalone browser page does not connect to a Guidance account, product data, or a live operating workflow.

Apply as a Design Partner